What does TFR mean in the cost analysis?

Modified on Fri, 5 Jul at 11:32 AM

When showing TFR in cost analysis, it means:

 

When you transfer a vehicle it credits each line back that has been posted as a cost and adds them all together and allocates that amount to the new department for (example Demo 32).  


The costs that are allocated against the deal will add when New (30) no longer need the full break down when transferred
 